Feb 24th, 2010
New node with i965 extreme and GTX295 arrived. Unfortunately, not with the expected (fast) memory (which is assumed to be on its way). Node installed without problems and benchmarked. Only CUDA left to set-up …
New node with i965 extreme and GTX295 arrived. Unfortunately, not with the expected (fast) memory (which is assumed to be on its way). Node installed without problems and benchmarked. Only CUDA left to set-up …
TS OVER STATION. All went down and came back up again gracefully.
<< Newer entries | Older entries >>





